国产亚洲aaa在线观看_国产av无码专区亚洲a√_国产明星婬乱一级毛片视频_中文字幕高清免费你懂的

Pressure test reservation

新聞資訊

新聞資訊

Tonzo ppr quickly install the elevator base is listed in March

2017-03-30
Product pictures
 

At the time of installation, a elevator base is installed at 1 m per interval.

As shown in the figure below:

Each hanger can be up to 600N.

It's about 4.8 N per meter in full water,

600N>>>>>>4.8N



Ensure the quality of the products is stable while ensuring the speed of installation.